-
Epic
-
Resolution: Done
-
Critical
-
ACM 2.15.0
OCP/Telco Definition of Done
https://docs.google.com/document/d/1TP2Av7zHXz4_fmeX4q9HB0m9cqSZ4F6Jd4AiVoaF_2s/edit#heading=h.gaa58bzbvwde
Epic Template descriptions and documentation.
https://docs.google.com/document/d/14CUCEg6hQ_jpsFzJtWo29GfFVWmun2Uivrxq3_Fkgdg/edit
ACM-wide Product Requirements (Top-level Epics)
https://docs.google.com/document/d/1uIp6nS2QZ766UFuZBaC9USs8dW_I5wVdtYF9sUObYKg/edit
*<--- Cut-n-Paste the entire contents of this description into your new
Epic --->*
Epic Goal
When performing non-recommended upgrades, try to look for the digest instead of using an image tag.
Why is this important?
For customers with disconnected environments, image tags does not work for them when performing non-recommended upgrades.
Scenarios
...
Acceptance Criteria
...
Dependencies (internal and external)
- ...
Previous Work (Optional):
- ...
Open questions:
- …
Done Checklist
- CI - CI is running, tests are automated and merged.
- Release Enablement <link to Feature Enablement Presentation>
- DEV - Upstream code and tests merged: <link to meaningful PR or GitHub
Issue> - DEV - Upstream documentation merged: <link to meaningful PR or GitHub
Issue> - DEV - Downstream build attached to advisory: <link to errata>
- QE - Test plans in Polarion: <link or reference to Polarion>
- QE - Automated tests merged: <link or reference to automated tests>
- DOC - Doc issue opened with a completed template. Separate doc issue
opened for any deprecation, removal, or any current known
issue/troubleshooting removal from the doc, if applicable. - Considerations were made for Extended Update Support (EUS)