-
Epic
-
Resolution: Unresolved
-
Normal
-
None
-
Global Hub 1.5.0
-
None
-
integrate Dev and QE test repo
-
Quality / Stability / Reliability
-
False
-
-
False
-
Green
-
Done
-
50% To Do, 0% In Progress, 50% Done
OCP/Telco Definition of Done
https://docs.google.com/document/d/1TP2Av7zHXz4_fmeX4q9HB0m9cqSZ4F6Jd4AiVoaF_2s/edit#heading=h.gaa58bzbvwde
Epic Template descriptions and documentation.
https://docs.google.com/document/d/14CUCEg6hQ_jpsFzJtWo29GfFVWmun2Uivrxq3_Fkgdg/edit
ACM-wide Product Requirements (Top-level Epics)
https://docs.google.com/document/d/1uIp6nS2QZ766UFuZBaC9USs8dW_I5wVdtYF9sUObYKg/edit
*<--- Cut-n-Paste the entire contents of this description into your new
Epic --->*
Epic Goal
related spike: https://issues.redhat.com/browse/ACM-17635
- Make sure current qe cases works fine in dev e2e env
- Public the https://github.com/stolostron/acmqe-hoh-e2e and https://github.com/stolostron/acmqe-go-library
- Move acmqe-hoh-e2e to https://github.com/stolostron/multicluster-global-hub
- Run acmqe-hoh-e2e cases in dev e2e test script.
- Merge acm and qe cases in e2e
- Upgrade ocm to 0.16(fix bug in 0.16, when delete managedcluster, globalhub addon still exist)
- Run different config metrix in e2e env
Why is this important?
...
Scenarios
...
Acceptance Criteria
...
Dependencies (internal and external)
- ...
Previous Work (Optional):
- ...
Open questions:
- …
Done Checklist
- CI - CI is running, tests are automated and merged.
- Release Enablement <link to Feature Enablement Presentation>
- DEV - Upstream code and tests merged: <link to meaningful PR or GitHub
Issue> - DEV - Upstream documentation merged: <link to meaningful PR or GitHub
Issue> - DEV - Downstream build attached to advisory: <link to errata>
- QE - Test plans in Polarion: <link or reference to Polarion>
- QE - Automated tests merged: <link or reference to automated tests>
- DOC - Doc issue opened with a completed template. Separate doc issue
opened for any deprecation, removal, or any current known
issue/troubleshooting removal from the doc, if applicable. - Considerations were made for Extended Update Support (EUS)