Uploaded image for project: 'Red Hat Advanced Cluster Management'
  1. Red Hat Advanced Cluster Management
  2. ACM-17037

Hub Installer: ACM 2.13 Skill Transfer

XMLWordPrintable

    • 1
    • False
    • Hide

      None

      Show
      None
    • False
    • Hide

      Provide the required acceptance criteria using this template.

      • ...
      Show
      Provide the required acceptance criteria using this template. ...
    • Installer Sprint 2025-54
    • None

      Value Statement

      At the end of the release, create a PowerPoint presentation for the ACM 2.13 / MCE 2.8 release, highlighting the work completed during the release for the Installer team.

      Definition of Done for Engineering Story Owner (Checklist)

      • [ ] PowerPoint presentation is created and covers all relevant work delivered in the ACM 2.13 / MCE 2.8 release.
      • [ ] The presentation is reviewed for accuracy and completeness by the team.
      • [ ] The presentation is stored in the designated location (e.g., Confluence, shared drive)
      • [ ] The PowerPoint is presented at the 2.13 Skill Transfer session.

              rh-ee-msmigiel Matthew Smigielski
              dbennett@redhat.com Disaiah Bennett
              Kurtis Wang Kurtis Wang
              Votes:
              0 Vote for this issue
              Watchers:
              3 Start watching this issue

                Created:
                Updated:
                Resolved: