-
Bug
-
Resolution: Unresolved
-
Undefined
-
None
-
None
-
False
-
None
-
False
-
-
-
-
None
Description of problem:
Ran an acm must-gather in the large scale environment with 3672 managed clusters, (3639 ztp-done=) and the collection took 101 minutes. Is it possible to reduce the time required to run this?
# time oc adm must-gather --image d16-h01-000-r650.rdu2.scalelab.redhat.com:5000/acm-d/acm-must-gather-rhel9:v2.11.0-37 --dest-dir="hub-acm-must-gather-2" ... [must-gather ] OUT 2024-08-07T13:41:00.983370263Z clusterrolebinding.rbac.authorization.k8s.io/must-gather-zhwlc deleted Reprinting Cluster State: When opening a support case, bugzilla, or issue please include the following summary data along with any other requested information: ClusterID: abebee12-e0d1-4a11-98d5-728686494efa ClientVersion: 4.16.3 ClusterVersion: Stable at "4.16.3" ClusterOperators: clusteroperator/machine-config is degraded because Failed to resync 4.16.3 because: error during syncRequiredMachineConfigPools: [context deadline exceeded, failed to update clusteroperator: [client rate limiter Wait returned an error: context deadline exceeded, error MachineConfigPool master is not ready, retrying. Status: (pool degraded: true total: 3, ready 0, updated: 0, unavailable: 3)]] real 101m25.969s user 1m15.719s sys 0m52.855s
Version-Release number of selected component (if applicable):
Hub 4.16.3
Deployed OCP - 4.14.31
ACM - 2.11.0-DOWNSTREAM-2024-07-10-21-49-48
How reproducible:
Steps to Reproduce:
- ...