-
Task
-
Resolution: Done
-
Major
-
None
-
None
-
False
-
-
False
-
None
- pulp api reroute needed
AAH-1544 - PR w/ collection signing enabled, any extra tests needed (add link to PR)
- Run through the full Partner Engineering workflow with signature uploads on the PR ephemeral env
- Have Daniel finalize signing infrastructure items on c.stage.rh.c (e.g. AAH-1371)
- Merge PR, run through PE workflow on c.stage.rh.c
- Have Daniel finalize signing infrastructure items on prod c.rh.c + Deploy Prod with master (unsure if these need to happen at the same time or in an order)
cc rochacbruno@redhat.com drodowic@redhat.com awcrosby5 cspealma@redhat.com