Bug
- [DBZ-8744] - Oracle log consistency check always fails after database refresh with residual archive logs
- [DBZ-8916] - DDL statement couldn't be parsed. PAGE_COMPRESSED
- [DBZ-8940] - Processing error because of incomplete date part of DATETIME datatype in MariaDB
- [DBZ-8975] - Multiple Predicates Don't Function with the Operator API
- [DBZ-8985] - NatsJetStreamIT fails
- [DBZ-8995] - Make StreamingChangeEventSource closeable
- [DBZ-9002] - The in-progress notification is sent before the snapshot job starts
- [DBZ-9003] - Connection left in "idle in transaction" state when setting snapshot mode to initial only
- [DBZ-9007] - DB2 for Z/OS Fixes
- [DBZ-9015] - IBMi connector is not included in Debezium Server
- [DBZ-9016] - PostgresSQL Read-only incremental snapshot continue to read chunks even with completed snapshot
- [DBZ-9019] - Oracle database PDB name in lowercase is not connecting to the connector.
- [DBZ-9027] - Error parsing MariaDB DDL
- [DBZ-9030] - LogMiner performance regression with buffered implementation
- [DBZ-9031] - Column named SEQUENCE, a MySQL keyword fails to be parsed
- [DBZ-9034] - MySQL parser fails when using a JSON_TABLE in a join clause
- [DBZ-9040] - Default values may be misinterpreted as bind parameters due to nested quotes
- [DBZ-9052] - Missing configuration properties for signal channel readers can lead to NullPointerException
- [DBZ-9055] - Blocking snapshot does not always resume streaming thread when task is in shutdown
- [DBZ-9065] - Error while parsing a MariaDB DDL
- [DBZ-9086] - Postgres Reselector fails on serial primary keys
- [DBZ-9101] - Removal of REST extension left service loader definition in Oracle connector
Task
- [DBZ-8758] - Upgrade MariaDB driver to 3.5.3
- [DBZ-8971] - Turn off opentelemetry logging in the tests
- [DBZ-9035] - Update Debezium base images to Fedora 41
Enhancement
- [DBZ-9072] - Uppdate Informix JDBC Driver to 4.50.11.2
- [DBZ-9085] - Exclude TRUNCATE and REPLACE statements from schema history
Edit/Copy Release Notes
The text area below allows the project release notes to be edited and copied to another document.