Uploaded image for project: 'SwitchYard'
  1. SwitchYard
  2. SWITCHYARD-2872

Update bpm tooling to match upstream bpmn2 modeler changes

    XMLWordPrintable

    Details

      Description

      The BPMN2 Modeler upstream has changed the old "jbpm5" plug-in to be just "jbpm". Need to update the SwitchYard BPM plug-ins that extend the BPMN2 Modeler to match in the Mars/master branch.

      See https://issues.jboss.org/browse/JBTIS-172

        Attachments

          Activity

            People

            Assignee:
            bfitzpat Brian Fitzpatrick
            Reporter:
            bfitzpat Brian Fitzpatrick
            Votes:
            0 Vote for this issue
            Watchers:
            3 Start watching this issue

              Dates

              Created:
              Updated:
              Resolved: