-
Task
-
Resolution: Unresolved
-
Normal
-
None
-
rhos-18.0.z
-
None
-
2
-
False
-
-
False
-
Not Selected
-
rhos-ops-day1day2-upgrades
-
-
-
RHOS Upgrades 2025 Sprint 18
-
1
Goal:
- After all feedback is incorporated in the RHEL EUS stream update procedure [Gdoc|https://docs.google.com/document/d/1RKM4qd7YPv7CkqYIH7iQKEIUZQSbXPOtnbK5-KJxYQw/edit?tab=t.0], transfer content to the minor update guide with Tech Preview label on it.
- Get a peer review, incorporate the feedback, and then publish.
Acceptance Criteria:
- MR is created and peer reviewed.
- Peer review feedback is incorporated.
- MR is merged and published.
- clones
-
OSPRH-22345 Incorporate SME feedback
-
- Closed
-