Uploaded image for project: 'Multiple Architecture Enablement'
  1. Multiple Architecture Enablement
  2. MULTIARCH-4666

Support Heterogeneous NodePools in HyperShift with Agent Platform

XMLWordPrintable

    • Icon: Epic Epic
    • Resolution: Unresolved
    • Icon: Undefined Undefined
    • None
    • None
    • Multi-Arch
    • Support Heterogeneous NodePools in HyperShift with Agent Platform
    • False
    • None
    • False
    • Not Selected
    • NEW
    • To Do
    • NEW
    • 33% To Do, 33% In Progress, 33% Done

      Epic Goal

      • Provide a way to install with varied architecture NodePools in Agent platform

      Why is this important?

      • Necessary to enable workloads with different architectures in the same Hosted Clusters.

      Scenarios

      1. I have an x86 hosted cluster and I want to have at least one NodePool running in ppc64le arch

      Acceptance Criteria

      • Dev - Has a valid enhancement if necessary
      • CI - MUST be running successfully with tests automated
      • QE - covered in Polarion test plan and tests implemente

      Dependencies (internal and external)

      1. The management cluster must use a multi architecture payload image.
      2. The target architecture is in the OCP payload
      3. MCE has builds for the architecture used by the worker nodes of the management cluster

      Done Checklist

      • CI - For new features (non-enablement), existing Multi-Arch CI jobs are not broken by the Epic
      • Release Enablement: <link to Feature Enablement Presentation>
      • DEV - Upstream code and tests merged: <link to meaningful PR orf GitHub Issue>
      • DEV - Upstream documentation merged: <link to meaningful PR or GitHub Issue>
      • DEV - If the Epic is adding a new stream, downstream build attached to advisory: <link to errata>
      • QE - Test plans in Test Plan tracking software (e.g. Polarion, RQM, etc.): <link or reference to the Test Plan>
      • QE - Automated tests merged: <link or reference to automated tests>
      • QE - QE to verify documentation when testing
      • DOC - Downstream documentation merged: <link to meaningful PR>
      • All the stories, tasks, sub-tasks and bugs that belong to this epic need to have been completed and indicated by a status of 'Done'.

              Unassigned Unassigned
              dravicha Dharaneeshwaran Ravichandran
              Votes:
              0 Vote for this issue
              Watchers:
              2 Start watching this issue

                Created:
                Updated: