Uploaded image for project: 'Keycloak'
  1. Keycloak
  2. KEYCLOAK-14429

Pull requests should include a successful before it is allowed to be merged.

    Details

    • Epic Name:
      UI Tests Should Run With Every PR
    • Epic Status:
      To Do
    • Docs QE Status:
      NEW
    • QE Status:
      NEW

      Description

      We should not allow a Pull Request to break the Admin Console or Account Console.  Therefore, all pull requests should automatically run the UI tests before it can be merged.

       

      The UI test suite has a few bugs that need to be fixed as part of this Epic.

        Gliffy Diagrams

          Attachments

            Activity

              People

              • Assignee:
                aboullos Alfredo Boullosa
                Reporter:
                ssilvert Stan Silvert
              • Votes:
                0 Vote for this issue
                Watchers:
                1 Start watching this issue

                Dates

                • Created:
                  Updated: