Details
-
Task
-
Resolution: Done
-
Critical
-
camel-K-M3
-
%
-
Camel-K
Description
We have several jobs that are executed manually ATM. QE needs a one central pipeline that will orchestrate the Camel K jobs. At the last stage, the pipeline will listen on UMB messages.
DoD:
- pipeline will be parametrized
- pipeline will consume messages from ENTESB "DEFINE_CONTRACT_BETWEEN_ENG_PROD"
- pipeline will execute all Camel K tests
- pipeline should be ready for UMB onboarding
- there will be basic documentation for the pipeline
Attachments
There are no Sub-Tasks for this issue.