Feature Overview (aka. Goal Summary)
An elevator pitch (value statement) that describes the Feature in a clear, concise way. Complete during New status.
CVO currently manages manifests being included in the payload based on whether or not they are in the currently enabled feature set, we are also adding support for feature gates in OCPSTRAT-2485.
To be able to build 5.0 and 4.23 from the same release branch (and possibly other future paired releases), we need the ability to include manifests based on their major version series.
Would like to see:
- The ability to include a specific manifest only when the OCP major version is X or lower
- The ability to include a specific manifest only when the OCP major version is X or higher
- The ability to include a specific manifest only when the OCP major version is X
This will then tie into allowing the API repo to inject different feature gates for a featureset depending on whether the payload was built as 4, 5, 6 etc
Goals (aka. expected user outcomes)
The observable functionality that the user now has as a result of receiving this feature. Include the anticipated primary user type/persona and which existing features, if any, will be expanded. Complete during New status.
Allow manifests to be included or excluded based on the particular OCP major version
Requirements (aka. Acceptance Criteria):
A list of specific needs or objectives that a feature must deliver in order to be considered complete. Be sure to include nonfunctional requirements such as security, reliability, performance, maintainability, scalability, usability, etc. Initial completion during Refinement status.
A new annotation can be added to manifests to allow them to be applied based on semantic equivalence to the major version of the release (`<=4, 5, >=5`)
Anyone reviewing this Feature needs to know which deployment configurations that the Feature will apply to (or not) once it's been completed. Describe specific needs (or indicate N/A) for each of the following deployment scenarios. For specific configurations that are out-of-scope for a given release, ensure you provide the OCPSTRAT (for the future to be supported configuration) as well.
| Deployment considerations | List applicable specific needs (N/A = not applicable) |
| Self-managed, managed, or both | |
| Classic (standalone cluster) | |
| Hosted control planes | |
| Multi node, Compact (three node), or Single node (SNO), or all | |
| Connected / Restricted Network | |
| Architectures, e.g. x86_x64, ARM (aarch64), IBM Power (ppc64le), and IBM Z (s390x) | |
| Operator compatibility | |
| Backport needed (list applicable versions) | |
| UI need (e.g. OpenShift Console, dynamic plugin, OCM) | |
| Other (please specify) |
Use Cases (Optional):
Include use case diagrams, main success scenarios, alternative flow scenarios. Initial completion during Refinement status.
<your text here>
Questions to Answer (Optional):
Include a list of refinement / architectural questions that may need to be answered before coding can begin. Initial completion during Refinement status.
<your text here>
Out of Scope
High-level list of items that are out of scope. Initial completion during Refinement status.
<your text here>
Background
Provide any additional context is needed to frame the feature. Initial completion during Refinement status.
<your text here>
Customer Considerations
Provide any additional customer-specific considerations that must be made when designing and delivering the Feature. Initial completion during Refinement status.
<your text here>
Documentation Considerations
Provide information that needs to be considered and planned so that documentation will meet customer needs. If the feature extends existing functionality, provide a link to its current documentation. Initial completion during Refinement status.
<your text here>
Interoperability Considerations
Which other projects, including ROSA/OSD/ARO, and versions in our portfolio does this feature impact? What interoperability test scenarios should be factored by the layered products? Initial completion during Refinement status.
<your text here>
- links to